Oakland, CA P&DC Sack Sorter Demolition
Demolition Design for Sack Sorters and Associated Equipment, Controls, Electrical, Structural Supports and HVAC
Challenges:
- Demolition occurred simultaneously with the installation of the new automated equipment.
- Demolition could not interfere with the daily operations.
- Demolition and equipment removal occurred on three floors through limited access points.
Benefits:
- Minimize operational impacts during demolition
- Time-scaled work sequence schedule
- Design interim barrier to protect personnel and equipment
Project Included:
- 2 Sack Sorters
- Over 3 ½ miles of conveyors
- 30 Spirals
- 61 Chutes
- 7 Slides
- 4 Sawteeth
- Platforms, Catwalks and Supports