Oakland, CA P&DC Sack Sorter Demolition

Demolition Design for Sack Sorters and Associated Equipment, Controls, Electrical, Structural Supports and HVAC

Challenges:

  • Demolition occurred simultaneously with the installation of the new automated equipment.
  • Demolition could not interfere with the daily operations.
  • Demolition and equipment removal occurred on three floors through limited access points.

Benefits:

  • Minimize operational impacts during demolition
  • Time-scaled work sequence schedule
  • Design interim barrier to protect personnel and equipment

Project Included:

  • 2 Sack Sorters
  • Over 3 ½ miles of conveyors
  • 30 Spirals
  • 61 Chutes
  • 7 Slides
  • 4 Sawteeth
  • Platforms, Catwalks and Supports